Paul H. Cocker Gallery Feature Wall Blog

This blog contains a series of documented artifacts contributing to the process and completion of the Paul H. Cocker Gallery Feature Wall at the Ryerson University Architecture Building.

Tuesday, 6 January 2015

PRODUCTION DAY 13 - FINAL INSTALLATION

The time is here! After installing each lock washer behind, we were able to insert each Corian component. Step by step and one by one, the team carefully completed the full surface. 



















































Posted by Unknown at 12:33
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Installation, Jason Ramelson, Jonathan Chan, Lock Washers, Michael Owens, Nishil Saheba, Nuts and Bolts, Paul H. Cocker Gallery Feature Wall, RGB LED Strip Lighting

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Contributors

  • Brant York
  • Michael Owens
  • Unknown
  • jason.ramelson

Blog Archive

  • ▼  2015 (20)
    • ►  August (1)
    • ▼  January (19)
      • A PANORAMA
      • IMAGES OF THE INTERIOR PRIOR TO CAPPING
      • LIGHTING TEST 5 - VIDEO
      • LIGHTING TEST 5
      • PRODUCTION DAY 13 - INSTALLATION TIME LAPSE
      • PRODUCTION DAY 13 - FINAL INSTALLATION
      • PRODUCTION DAY 13 - LOCK WASHERS
      • PRODUCTION DAY 12 - DETAIL AND ASSEMBLY TESTING
      • PRODUCTION DAY 12 - STORAGE & ORGANIZATION
      • PRODUCTION DAY 11 - PANEL INSTALLATION
      • THE WONDERFUL UNDERSIDE
      • PRODUCTION DAY 10 - SURFACE GLUING THREE
      • PRODUCTION DAY 9 - SURFACE GLUING TWO
      • LIGHTING TEST 4
      • PRODUCTION DAY 8 - LIGHTING ASSEMBLY
      • PRODUCTION DAY 8 - SURFACE GLUING ONE
      • SEASONS GREETINGS FROM THE FEATURE WALL TEAM!
      • PRODUCTION DAY 7 - THE FINAL PIECES
      • THE FINAL PRODUCTION SET UP
  • ►  2014 (26)
    • ►  December (21)
    • ►  November (5)
Awesome Inc. theme. Powered by Blogger.