The time is here! After installing each lock washer behind, we were able to insert each Corian component. Step by step and one by one, the team carefully completed the full surface.
This blog contains a series of documented artifacts contributing to the process and completion of the Paul H. Cocker Gallery Feature Wall at the Ryerson University Architecture Building.
Showing posts with label Jason Ramelson. Show all posts
Showing posts with label Jason Ramelson. Show all posts
Tuesday, 6 January 2015
PRODUCTION DAY 12 - DETAIL AND ASSEMBLY TESTING
On our first attempt to assemble the wall, we came into some minor road blocks which included difficulty in accessing some bolts in the fastening process. To alleviate this issue, we slowly started on the right top corner of the wall and worked our way downwards in an orderly fashion.
![]() |
| The first few pieces! |
![]() |
| Jason hoisting components into place |
![]() |
| A close-up view of the bolted detail |
![]() |
| Jason bolting in a component |
![]() |
| Mike bolting in the next component |
![]() |
| Jonathan bolting in a component |
![]() |
| We left off here for the night with anticipation for a refined detail that we hoped to work for future assembly |
PRODUCTION DAY 11 - PANEL INSTALLATION
Even though we hoisted and removed the backer panels on numerous occasions, this was our final application. One by one, we cleaned, raised and bolted each successful backer panel.
![]() |
| Jason bolting panel four into place |
| Jason and Mike hoisting panel two into place |
![]() |
| All backer panels bolted into place |