PRODUCTION DAY 13 - FINAL INSTALLATION

The time is here! After installing each lock washer behind, we were able to insert each Corian component. Step by step and one by one, the team carefully completed the full surface. 



















































PRODUCTION DAY 12 - DETAIL AND ASSEMBLY TESTING

On our first attempt to assemble the wall, we came into some minor road blocks which included difficulty in accessing some bolts in the fastening process. To alleviate this issue, we slowly started on the right top corner of the wall and worked our way downwards in an orderly fashion. 

The first few pieces!
Jason hoisting components into place




A close-up view of the bolted detail










Jason bolting in a component
Mike bolting in the next component




Jonathan bolting in a component

We left off here for the night with anticipation for a refined detail that we hoped to work for future assembly

PRODUCTION DAY 11 - PANEL INSTALLATION

Even though we hoisted and removed the backer panels on numerous occasions, this was our final application. One by one, we cleaned, raised and bolted each successful backer panel.









Jason bolting panel four into place




Jason and Mike hoisting panel two into place



All backer panels bolted into place