Thursday 11 December 2014

PRODUCTION DAY 1: BACKER PANELS

Once the Lexan sheets have been processed from the CNC, post-processing occurred. We sanded (or frosted) the front panel as to allow for light diffusion towards the building as well as a transparent screen to the structure behind. Both sides of the backer panels were routed to ensure flexibility in tolerance and ease of access for the to-be-inserted components.  

Two halves of a backer panel: one transparent and one translucent.  


Brant having the time of his life!


Brant and Nadia sanding one of the front faces of a backer panel. 



Nishil routing some edges!

Acrylic spacers are added in between each face.

Mike bolting each face together to produce one panel. 

Two finished panels.