| Gluing jigs were prepared to ensure a 3" (the thickness of the backer panel) offset from the base of the extrusions. |
| Pre-cut flanges with holes for securing the components to the backer panels. |
| The team in an assembly line fashion. |
| Cleaning the jig. |
| Scraping excess glue. |
| The component drying in the jig. |
| The team hard at work. |
| The collection of completed components. |
| A demonstration of the fitting. |
No comments:
Post a Comment