Thursday 11 December 2014

PRODUCTION DAY 4: GLUING FLANGES

Gluing jigs were prepared to ensure a 3" (the thickness of the backer panel)
offset from the base of the extrusions.  

Pre-cut flanges with holes for securing the components to the backer panels. 
The team in an assembly line fashion. 
 
Cleaning the jig.


Scraping excess glue.

 
The component drying in the jig.



The team hard at work.



The collection of completed components. 
  
A demonstration of the fitting.  

No comments:

Post a Comment