Showing posts with label Stephanie Steriotis. Show all posts
Showing posts with label Stephanie Steriotis. Show all posts

Thursday, 11 December 2014

THE TEAM

This project would not be possible without the help of our incredible team: 

Jason Ramelson
Michael Owens
Jonathan Chan
Nadia Corsetti
Nishil Saheba
Stephanie Steriotis
Robyn Thomson
Brant York
Dadin Duldul
Richelle Ng

 We would also like to thank the following people for their time and effort and leading us towards success:

Frank Bowen
Blaine Evans
Vincent Hui
Colin Ripley
Gow Hastings Architects Inc.


PRODUCTION DAY 4: GLUING FLANGES

Gluing jigs were prepared to ensure a 3" (the thickness of the backer panel)
offset from the base of the extrusions.  

Pre-cut flanges with holes for securing the components to the backer panels. 
The team in an assembly line fashion. 
 
Cleaning the jig.


Scraping excess glue.

 
The component drying in the jig.



The team hard at work.



The collection of completed components. 
  
A demonstration of the fitting.  

PRODUCTION DAY 2: GLUING EXTRUSIONS

Today, the team worked on gluing and finishing the extrusions that will soon be inserted into the backer panels. The fabrication and assembly process is as follows:

Pre-taped extrusions ready to be glued


Cleaning the extrusions with Methyl Hydrate


Brant gluing the edge conditions
Folding the panels to create an extrusion




Taping the extrusion closed


Cleaning the fully glued extrusion




The assembly line in action
 



Extrusions being hauled off to storage





A collection of finalized extrusions