Showing posts with label Triangulated Surfaces. Show all posts
Showing posts with label Triangulated Surfaces. Show all posts

Tuesday, 6 January 2015

PRODUCTION DAY 12 - STORAGE & ORGANIZATION

Before embarking on final installation, we brought up and sorted each component in the PIT to ensure flexibility and ease of assembly. 



THE WONDERFUL UNDERSIDE

One of the more random occurrences in this project was the ability for us to identify intriguing moments that were not anticipated at the onset of design.


Here are a series of images revealing the underside of the glued surface






The underside under a lit condition

PRODUCTION DAY 10 - SURFACE GLUING THREE

On our final day of gluing, we were able to get through panels four to six. Our final piece was of course the name plate showcasing the team and its supporters. 

















PRODUCTION DAY 9 - SURFACE GLUING TWO

Continuing with our precious process, we have moved on to panels two and three on the second day of gluing. 











Thursday, 11 December 2014

DIGITAL MODELLING PROCESSES

Existing steel structure

Backer panels

Backer panels with milling information

Extrusions

Flanges 

19" equilaterally triangulated surface 

Etch lines for back of panels (to insert extrusions)

Cap panels

Final wall construction

CNC sheets